In a bid to enhance road safety and driving experience, the Federal Government has shut down Eko Bridge and Ramps for essential asphalt resurfacing, effective September 20 to November 20.
According to Olukorede Kesha, Federal Controller of Works, Lagos, “The closure will be full at some sections of the bridge and partial at other sections.” Kesha emphasized, “This critical project aims to improve road safety and enhance the driving experience of motorists.”
The project involves milling existing asphalt and relaying new asphalt on the bridge and ramps to address wear and tear, ensuring a smoother and safer roadway.
To mitigate disruptions, Kesha provided alternate routes:
“Motorists going to the Island from Funsho Williams Avenue should use the service lane at Alaka to connect Costain and access Eko Bridge… Island: Access Costain to connect Eko Bridge and link Apongbon.”
READ ALSO:Lagos govt announces 8-week closure of Eko Bridge for emergency repairs
The recommended diversions:
– From Funsho Williams Avenue to the Island: Use Alaka service lane to Costain
– Island to Eko Bridge: Access Costain, then Apongbon
– Apongbon to Eko Bridge: Link Costain to Funsho Williams Avenue
– Costain to Alaka/Funsho Williams Avenue: Pass through Apapa Road, Oyingbo, Adekunle, and Third Mainland Bridge
– Surulere: Use Costain, Breweries, Abebe Village, Eric Moore/Bode Thomas
Kesha urged residents and businesses to plan travel accordingly, assuring that appropriate signage and traffic control measures will guide drivers and pedestrians.
“We appreciate the public’s patience and cooperation as we work to improve the country’s infrastructure,” Kesha said, apologizing for any inconvenience.
For more information on navigation and alternate routes, residents can consult online maps or transportation resources.
The post Govt shuts Eko bridge, ramps for 8-week resurfacing work amid safety concerns appeared first on Latest Nigeria News | Top Stories from Naomisophyblog.